Dukedog variations – Sandboxes

No.9000 Sandboxes and Top Feed fitted

A number of the Dukedog’s had above footplate sandboxes as determined by the frames of the donating Bulldog.  No.9000 and No.9005 will feature in the Works, both of which had this particular trait.  There is also another slight variation, No.9000 and No.9005 had their pull rods above the filler lids, whereas 9008 had them running along side the sandboxes, in between the wheel splashers and springs (it’s quite hard to make out, but here is a picture courtesy of the GWSR)

This evenings task was seeing how the 3D printed sandboxes for 9000 and 9005 would fit.  I’ve had to tweak them a few times to deal with the slight lip on running plate near the rear wheel splashers.  First job though was to remove the front sandbox lids from the running plate.  These are part of the metal chassis and were not going to budge with a knife, so I threaded a piecing saw blade between the boiler and the running plate in order to cut them away.

Removing the sandbox lids

First complication was that the front grab rails needed removing in order to get a decent cut.  These are also metal and quite hard to remove cleanly, in fact I only successfully pulled one, with the other three snapping off and leaving the peg in the chassis.  After taking off the sandbox lids I redrilled these ready for fitting replacements.

The sandboxes ping off their build supports really easily, but they do need a little cleaning up with a knife or needle file to ensure a flush fit.  The build support penetration can be configured, in this case it was set to 25 microns, so if you remove the supports carefully they just need a quick once over with a file.

I’ve experimented with what angle to build them at quite a bit, the best detail being printing them in the normal orientation, but this does mean the base of them is rather uneven – this is due to the resin dripping away and some of it curing.  I’m sure that can be resolved, once I replace the layer of silicone in the printer I should get even sharper prints.  But for the time being I’ve rotated the prints 45 degrees which gives best of both worlds.

Dukedog Detailing Parts

On the top of the sandboxes I’d added the short spigots for the pull rods to connect to, more as a test if anything to see if the printer would cope with them. It did, but in practice they are useless, there is nothing for the pull rod to attach to and its too fine a point for glue.  These were clipped off and 0.4mm handrail wire used instead, allowing the brass strip pull rods to be soldered to the handrail wire.

Fitting 0.4mm brass spigots

Sandbox pull rod fitting

With that done the next jobs were to bring No.9000 up to the same basic detailed level of No.9018 – replace all the buffer beam fittings, add the ATC electrical conduit etc.  The top feed also needed fixing and the pipework modifying, all tasks which involve a fair bit of handling and not ideal after just fixing the sandbox pull rods!  Next time round I’ll put them on last as the pull rod connection to the spigots is quite delicate.

No.9000 Sandboxes and Top Feed fitted

No.9000 Sandboxes and Top Feed fitted

Blowing the dust off 5726

5726 progress

It’s been 8 months since I did anything to 5726, it being the first locomotive that I’d attempted to detail.  It was turning into a bit of a test bed to try out techniques, some worked well, some didn’t and some need revisiting (again!).

It’s been a big help seeing the progress Tom Foster is making on his Panniers and we’ve both being taking inspiration from similar sources – PMP’s Albion Yard and George Dents excellent Detailing and Modifying RTR loco’s, both which have been invaluable to the beginner in detailing.  The push I needed to do some modelling again was reading James Wells post about his 57xx project, detailed and weathered to a high standard in a short space of time.  Cheers James!

The last time 5726 was out it was in quite a sorry state: hand rails removed; whistles removed and refitted a few times, still not happy with them; and lastly I’d started to remove the moulded pipework along the running plate with a view to replacing with brass and copper wire.  Today’s tasks have been to finish the handrails, redo the sandbox pull rods and replace the moulded pipework.   Jobs for 2015 are to have a go at 3D printing a new whistle/manifold/shield assembly, build the etched chassis and finally paint and weather.

Handrails – I’d started work on replacing the handrails back in April and would have finished that step today had I not run out of handrail knobs… the main tank handrail is finished, using AG 0.4mm brass wire and handrail knobs.  Now just the small tank grab rails and cab rails to finish.

Sandbox Pull Rods – Both Tom and James have fitted their RT sandbox etch in a more prototypical manner, which looks much better, so this was the first task to rectify.  Previously I’d had the pull rod fixed to the top of the sandbox lid, where in reality it should be attached just behind the lid to a short pivot.  I used AG 0.4mm handrail wire and soldered it to the end of the pull rod, then positioned into a small drill hole in the running plate.

Replacement Vacuum and Injector Overflow pipework – this was another task inspired by reading Iain Rice’s Etched Loco Construction and something also on the list for 7410.  It was surprisingly easy to remove the moulded pipe work with a flat tipped Xacto knife blade, working along the running plate.   Before starting out, as with trying to make my own injectors for 7410, I needed to understand what I was trying to recreate first.  To help with this I’d recently picked up a BR era copy of the Handbook for Railway Steam Locomotive Enginemen, which has descriptive colour coded diagrams of everything, just what I need for my non-mechanical brain!

Looking through the Pannier papers and at other photos, it looks as though the vacuum pipe runs the length of the left hand side – for these I used AG’s 0.7mm handrail wire. The slightly smaller diameter steam heating pipe runs the length of the right hand side, usually insulated in cloth cladding – 0.4mm handrail wire seemed about right for these.   For the small fastening clips I’ve folded over 1mm phosphor bronze strip and used 14BA washers for the pipework joins.

The injector overflows look like a slightly larger diameter pipe to the vacuum pipes – for those I used 20 SWG copper wire and 16BA washers for the joins.  I’m not 100% happy with them, the bends need to be a bit neater but I’ll see what they look like when painted.  Overall though, I’m happy and its been another good learning exercise!  Next update will be once the handrails are sorted and I’ve had a go at printing the whistle assembly, or part of it so I can still use the turned brass whistles.